Democratic Republic of the Congo vs Ghana: Dealing with construction permits: Quality control after construction
Democratic Republic of the Congo
2 DB16-20 methodology
in 2019
Ghana
2 DB16-20 methodology
in 2019
Democratic Republic of the Congo rank
134th
Ghana rank
134th
Dealing with construction permits: Quality control after construction over time
- Democratic Republic of the Congo
- Ghana
How they compare
Democratic Republic of the Congo currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Ghana, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Ghana has been ahead every year.
Democratic Republic of the Congo ranks 134th and Ghana ranks 134th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Democratic Republic of the Congo or Ghana?
- Democratic Republic of the Congo, at 2 DB16-20 methodology against 2 DB16-20 methodology in Ghana as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Democratic Republic of the Congo and Ghana?
- 0 DB16-20 methodology, with Democratic Republic of the Congo ahead.
- How many years of comparable data are there for Democratic Republic of the Congo and Ghana?
- 6 years are reported by both, from 2014 to 2019.
- How do Democratic Republic of the Congo and Ghana rank globally for dealing with construction permits: quality control after construction?
- Democratic Republic of the Congo ranks 134th and Ghana ranks 134th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.