Democratic Republic of the Congo vs Mexico: Dealing with construction permits: Quality control after construction

Democratic Republic of the Congo
2 DB16-20 methodology
in 2019
Mexico
2.17 DB16-20 methodology
in 2019
Democratic Republic of the Congo rank
134th
Mexico rank
133rd

Dealing with construction permits: Quality control after construction over time

  • Democratic Republic of the Congo
  • Mexico
00.511.52201420162019

How they compare

Mexico currently reports 2.17 DB16-20 methodology against 2 DB16-20 methodology in Democratic Republic of the Congo, a difference of 0.17 DB16-20 methodology.

That makes Mexico's figure about 1.1 times Democratic Republic of the Congo's.

Across all 6 years both countries report, Mexico has been ahead every year.

Democratic Republic of the Congo ranks 134th and Mexico ranks 133rd of 185 countries.

Mexico has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Democratic Republic of the Congo or Mexico?
Mexico, at 2.17 DB16-20 methodology against 2 DB16-20 methodology in Democratic Republic of the Congo as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Democratic Republic of the Congo and Mexico?
0.17 DB16-20 methodology, with Mexico ahead.
How many years of comparable data are there for Democratic Republic of the Congo and Mexico?
6 years are reported by both, from 2014 to 2019.
How do Democratic Republic of the Congo and Mexico rank globally for dealing with construction permits: quality control after construction?
Democratic Republic of the Congo ranks 134th and Mexico ranks 133rd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Democratic Republic of the Congo vs Mexico: Dealing with construction permits: Quality control after construction. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/congo-dem-rep/mexico/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/congo-dem-rep/mexico/">Democratic Republic of the Congo vs Mexico: Dealing with construction permits: Quality control after construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.