Congo vs Kiribati: Dealing with construction permits: Quality control after construction

Congo
2 DB16-20 methodology
in 2019
Kiribati
2 DB16-20 methodology
in 2019
Congo rank
134th
Kiribati rank
134th

Dealing with construction permits: Quality control after construction over time

  • Congo
  • Kiribati
00.511.52201420162019

How they compare

Congo currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Kiribati, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Kiribati has been ahead every year.

Congo ranks 134th and Kiribati ranks 134th of 185 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Congo or Kiribati?
Congo, at 2 DB16-20 methodology against 2 DB16-20 methodology in Kiribati as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Congo and Kiribati?
0 DB16-20 methodology, with Congo ahead.
How many years of comparable data are there for Congo and Kiribati?
6 years are reported by both, from 2014 to 2019.
How do Congo and Kiribati rank globally for dealing with construction permits: quality control after construction?
Congo ranks 134th and Kiribati ranks 134th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Congo vs Kiribati: Dealing with construction permits: Quality control after construction. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/congo-rep/kiribati/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/congo-rep/kiribati/">Congo vs Kiribati: Dealing with construction permits: Quality control after construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.