Congo vs Nigeria: Dealing with construction permits: Quality control after construction
Dealing with construction permits: Quality control after construction over time
- Congo
- Nigeria
How they compare
Nigeria currently reports 2.77 DB16-20 methodology against 2 DB16-20 methodology in Congo, a difference of 0.77 DB16-20 methodology.
That makes Nigeria's figure about 1.4 times Congo's.
Across all 6 years both countries report, Nigeria has been ahead every year.
Congo ranks 132nd and Nigeria ranks 129th of 183 countries.
Nigeria has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Congo or Nigeria?
- Nigeria, at 2.77 DB16-20 methodology against 2 DB16-20 methodology in Congo as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Congo and Nigeria?
- 0.77 DB16-20 methodology, with Nigeria ahead.
- How many years of comparable data are there for Congo and Nigeria?
- 6 years are reported by both, from 2014 to 2019.
- How do Congo and Nigeria rank globally for dealing with construction permits: quality control after construction?
- Congo ranks 132nd and Nigeria ranks 129th of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.