Cyprus vs Namibia: Dealing with construction permits: Quality control after construction
Cyprus
3 DB16-20 methodology
in 2019
Namibia
3 DB16-20 methodology
in 2019
Cyprus rank
1st
Namibia rank
1st
Dealing with construction permits: Quality control after construction over time
- Cyprus
- Namibia
How they compare
Cyprus currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Namibia, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Namibia has been ahead every year.
Cyprus ranks 1st and Namibia ranks 1st of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Cyprus or Namibia?
- Cyprus, at 3 DB16-20 methodology against 3 DB16-20 methodology in Namibia as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Cyprus and Namibia?
- 0 DB16-20 methodology, with Cyprus ahead.
- How many years of comparable data are there for Cyprus and Namibia?
- 6 years are reported by both, from 2014 to 2019.
- How do Cyprus and Namibia rank globally for dealing with construction permits: quality control after construction?
- Cyprus ranks 1st and Namibia ranks 1st of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.