Denmark vs Kuwait: Dealing with construction permits: Quality control after construction

Denmark
3 DB16-20 methodology
in 2019
Kuwait
3 DB16-20 methodology
in 2019
Denmark rank
1st
Kuwait rank
1st

Dealing with construction permits: Quality control after construction over time

  • Denmark
  • Kuwait
0123201420162019

How they compare

Denmark currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Kuwait, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Kuwait has been ahead every year.

Denmark ranks 1st and Kuwait ranks 1st of 183 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Denmark or Kuwait?
Denmark, at 3 DB16-20 methodology against 3 DB16-20 methodology in Kuwait as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Denmark and Kuwait?
0 DB16-20 methodology, with Denmark ahead.
How many years of comparable data are there for Denmark and Kuwait?
6 years are reported by both, from 2014 to 2019.
How do Denmark and Kuwait rank globally for dealing with construction permits: quality control after construction?
Denmark ranks 1st and Kuwait ranks 1st of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.