Ecuador vs Hungary: Dealing with construction permits: Quality control after construction
Ecuador
3 DB16-20 methodology
in 2019
Hungary
3 DB16-20 methodology
in 2019
Ecuador rank
1st
Hungary rank
1st
Dealing with construction permits: Quality control after construction over time
- Ecuador
- Hungary
How they compare
Ecuador currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Hungary, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Hungary has been ahead every year.
Ecuador ranks 1st and Hungary ranks 1st of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Ecuador or Hungary?
- Ecuador, at 3 DB16-20 methodology against 3 DB16-20 methodology in Hungary as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Ecuador and Hungary?
- 0 DB16-20 methodology, with Ecuador ahead.
- How many years of comparable data are there for Ecuador and Hungary?
- 6 years are reported by both, from 2014 to 2019.
- How do Ecuador and Hungary rank globally for dealing with construction permits: quality control after construction?
- Ecuador ranks 1st and Hungary ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.