El Salvador vs Saint Lucia: Dealing with construction permits: Quality control after construction
El Salvador
3 DB16-20 methodology
in 2019
Saint Lucia
3 DB16-20 methodology
in 2019
El Salvador rank
1st
Saint Lucia rank
1st
Dealing with construction permits: Quality control after construction over time
- El Salvador
- Saint Lucia
How they compare
El Salvador currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Saint Lucia, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Saint Lucia has been ahead every year.
El Salvador ranks 1st and Saint Lucia ranks 1st of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, El Salvador or Saint Lucia?
- El Salvador, at 3 DB16-20 methodology against 3 DB16-20 methodology in Saint Lucia as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between El Salvador and Saint Lucia?
- 0 DB16-20 methodology, with El Salvador ahead.
- How many years of comparable data are there for El Salvador and Saint Lucia?
- 6 years are reported by both, from 2014 to 2019.
- How do El Salvador and Saint Lucia rank globally for dealing with construction permits: quality control after construction?
- El Salvador ranks 1st and Saint Lucia ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.