France vs Germany: Dealing with construction permits: Quality control after construction
France
2 DB16-20 methodology
in 2019
Germany
2 DB16-20 methodology
in 2019
France rank
134th
Germany rank
134th
Dealing with construction permits: Quality control after construction over time
- France
- Germany
How they compare
France currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Germany, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Germany has been ahead every year.
France ranks 134th and Germany ranks 134th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, France or Germany?
- France, at 2 DB16-20 methodology against 2 DB16-20 methodology in Germany as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between France and Germany?
- 0 DB16-20 methodology, with France ahead.
- How many years of comparable data are there for France and Germany?
- 6 years are reported by both, from 2014 to 2019.
- How do France and Germany rank globally for dealing with construction permits: quality control after construction?
- France ranks 134th and Germany ranks 134th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.