Guatemala vs Jordan: Dealing with construction permits: Quality control after construction
Guatemala
3 DB16-20 methodology
in 2019
Jordan
3 DB16-20 methodology
in 2019
Guatemala rank
1st
Jordan rank
1st
Dealing with construction permits: Quality control after construction over time
- Guatemala
- Jordan
How they compare
Guatemala currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Jordan, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Jordan has been ahead every year.
Guatemala ranks 1st and Jordan ranks 1st of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Guatemala or Jordan?
- Guatemala, at 3 DB16-20 methodology against 3 DB16-20 methodology in Jordan as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Guatemala and Jordan?
- 0 DB16-20 methodology, with Guatemala ahead.
- How many years of comparable data are there for Guatemala and Jordan?
- 6 years are reported by both, from 2014 to 2019.
- How do Guatemala and Jordan rank globally for dealing with construction permits: quality control after construction?
- Guatemala ranks 1st and Jordan ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.