Guatemala vs Palau: Dealing with construction permits: Quality control after construction
Guatemala
3 DB16-20 methodology
in 2019
Palau
3 DB16-20 methodology
in 2019
Guatemala rank
1st
Palau rank
1st
Dealing with construction permits: Quality control after construction over time
- Guatemala
- Palau
How they compare
Guatemala currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Palau, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Palau has been ahead every year.
Guatemala ranks 1st and Palau ranks 1st of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Guatemala or Palau?
- Guatemala, at 3 DB16-20 methodology against 3 DB16-20 methodology in Palau as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Guatemala and Palau?
- 0 DB16-20 methodology, with Guatemala ahead.
- How many years of comparable data are there for Guatemala and Palau?
- 6 years are reported by both, from 2014 to 2019.
- How do Guatemala and Palau rank globally for dealing with construction permits: quality control after construction?
- Guatemala ranks 1st and Palau ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.