Hong Kong, China vs Venezuela, Bolivarian Republic of: Dealing with construction permits: Quality control after construction
Dealing with construction permits: Quality control after construction over time
- Hong Kong, China
- Venezuela, Bolivarian Republic of
How they compare
Hong Kong, China currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Venezuela, Bolivarian Republic of, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Venezuela, Bolivarian Republic of has been ahead every year.
Hong Kong, China ranks 1st and Venezuela, Bolivarian Republic of ranks 1st of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Hong Kong, China or Venezuela, Bolivarian Republic of?
- Hong Kong, China, at 3 DB16-20 methodology against 3 DB16-20 methodology in Venezuela, Bolivarian Republic of as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Hong Kong, China and Venezuela, Bolivarian Republic of?
- 0 DB16-20 methodology, with Hong Kong, China ahead.
- How many years of comparable data are there for Hong Kong, China and Venezuela, Bolivarian Republic of?
- 6 years are reported by both, from 2014 to 2019.
- How do Hong Kong, China and Venezuela, Bolivarian Republic of rank globally for dealing with construction permits: quality control after construction?
- Hong Kong, China ranks 1st and Venezuela, Bolivarian Republic of ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.