India vs Iran: Dealing with construction permits: Quality control after construction
India
3 DB16-20 methodology
in 2019
Iran
3 DB16-20 methodology
in 2019
India rank
1st
Iran rank
1st
Dealing with construction permits: Quality control after construction over time
- India
- Iran
How they compare
India currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Iran, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Iran has been ahead every year.
India ranks 1st and Iran ranks 1st of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, India or Iran?
- India, at 3 DB16-20 methodology against 3 DB16-20 methodology in Iran as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between India and Iran?
- 0 DB16-20 methodology, with India ahead.
- How many years of comparable data are there for India and Iran?
- 6 years are reported by both, from 2014 to 2019.
- How do India and Iran rank globally for dealing with construction permits: quality control after construction?
- India ranks 1st and Iran ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.