Iran, Islamic Republic of vs Kosovo (UNSCR 1244): Dealing with construction permits: Quality control after construction
Dealing with construction permits: Quality control after construction over time
- Iran, Islamic Republic of
- Kosovo (UNSCR 1244)
How they compare
Iran, Islamic Republic of currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Kosovo (UNSCR 1244), a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Kosovo (UNSCR 1244) has been ahead every year.
Iran, Islamic Republic of ranks 1st and Kosovo (UNSCR 1244) ranks 1st of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Iran, Islamic Republic of or Kosovo (UNSCR 1244)?
- Iran, Islamic Republic of, at 3 DB16-20 methodology against 3 DB16-20 methodology in Kosovo (UNSCR 1244) as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Iran, Islamic Republic of and Kosovo (UNSCR 1244)?
- 0 DB16-20 methodology, with Iran, Islamic Republic of ahead.
- How many years of comparable data are there for Iran, Islamic Republic of and Kosovo (UNSCR 1244)?
- 6 years are reported by both, from 2014 to 2019.
- How do Iran, Islamic Republic of and Kosovo (UNSCR 1244) rank globally for dealing with construction permits: quality control after construction?
- Iran, Islamic Republic of ranks 1st and Kosovo (UNSCR 1244) ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.