Iran, Islamic Republic of vs Türkiye: Dealing with construction permits: Quality control after construction
Iran, Islamic Republic of
3 DB16-20 methodology
in 2019
Türkiye
3 DB16-20 methodology
in 2019
Iran, Islamic Republic of rank
1st
Türkiye rank
1st
Dealing with construction permits: Quality control after construction over time
- Iran, Islamic Republic of
- Türkiye
How they compare
Iran, Islamic Republic of currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Türkiye, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Türkiye has been ahead every year.
Iran, Islamic Republic of ranks 1st and Türkiye ranks 1st of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Iran, Islamic Republic of or Türkiye?
- Iran, Islamic Republic of, at 3 DB16-20 methodology against 3 DB16-20 methodology in Türkiye as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Iran, Islamic Republic of and Türkiye?
- 0 DB16-20 methodology, with Iran, Islamic Republic of ahead.
- How many years of comparable data are there for Iran, Islamic Republic of and Türkiye?
- 6 years are reported by both, from 2014 to 2019.
- How do Iran, Islamic Republic of and Türkiye rank globally for dealing with construction permits: quality control after construction?
- Iran, Islamic Republic of ranks 1st and Türkiye ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.