Ireland vs Serbia: Dealing with construction permits: Quality control after construction
Ireland
3 DB16-20 methodology
in 2019
Serbia
3 DB16-20 methodology
in 2019
Ireland rank
1st
Serbia rank
1st
Dealing with construction permits: Quality control after construction over time
- Ireland
- Serbia
How they compare
Ireland currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Serbia, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Serbia has been ahead every year.
Ireland ranks 1st and Serbia ranks 1st of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Ireland or Serbia?
- Ireland, at 3 DB16-20 methodology against 3 DB16-20 methodology in Serbia as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Ireland and Serbia?
- 0 DB16-20 methodology, with Ireland ahead.
- How many years of comparable data are there for Ireland and Serbia?
- 6 years are reported by both, from 2014 to 2019.
- How do Ireland and Serbia rank globally for dealing with construction permits: quality control after construction?
- Ireland ranks 1st and Serbia ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.