Jordan vs Mozambique: Dealing with construction permits: Quality control after construction

Jordan
3 DB16-20 methodology
in 2019
Mozambique
3 DB16-20 methodology
in 2019
Jordan rank
1st
Mozambique rank
1st

Dealing with construction permits: Quality control after construction over time

  • Jordan
  • Mozambique
0123201420162019

How they compare

Jordan currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Mozambique, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Mozambique has been ahead every year.

Jordan ranks 1st and Mozambique ranks 1st of 185 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Jordan or Mozambique?
Jordan, at 3 DB16-20 methodology against 3 DB16-20 methodology in Mozambique as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Jordan and Mozambique?
0 DB16-20 methodology, with Jordan ahead.
How many years of comparable data are there for Jordan and Mozambique?
6 years are reported by both, from 2014 to 2019.
How do Jordan and Mozambique rank globally for dealing with construction permits: quality control after construction?
Jordan ranks 1st and Mozambique ranks 1st of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Jordan vs Mozambique: Dealing with construction permits: Quality control after construction. Statizoid. Retrieved 21 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/jordan/mozambique/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/jordan/mozambique/">Jordan vs Mozambique: Dealing with construction permits: Quality control after construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.