Kenya vs Mexico: Dealing with construction permits: Quality control after construction
Dealing with construction permits: Quality control after construction over time
- Kenya
- Mexico
How they compare
Mexico currently reports 2.17 DB16-20 methodology against 2 DB16-20 methodology in Kenya, a difference of 0.17 DB16-20 methodology.
That makes Mexico's figure about 1.1 times Kenya's.
Across all 6 years both countries report, Mexico has been ahead every year.
Kenya ranks 134th and Mexico ranks 133rd of 185 countries.
Mexico has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Kenya or Mexico?
- Mexico, at 2.17 DB16-20 methodology against 2 DB16-20 methodology in Kenya as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Kenya and Mexico?
- 0.17 DB16-20 methodology, with Mexico ahead.
- How many years of comparable data are there for Kenya and Mexico?
- 6 years are reported by both, from 2014 to 2019.
- How do Kenya and Mexico rank globally for dealing with construction permits: quality control after construction?
- Kenya ranks 134th and Mexico ranks 133rd of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.