Republic of Korea vs Luxembourg: Dealing with construction permits: Quality control after construction
Republic of Korea
3 DB16-20 methodology
in 2019
Luxembourg
3 DB16-20 methodology
in 2019
Republic of Korea rank
1st
Luxembourg rank
1st
Dealing with construction permits: Quality control after construction over time
- Republic of Korea
- Luxembourg
How they compare
Republic of Korea currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Luxembourg, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Luxembourg has been ahead every year.
Republic of Korea ranks 1st and Luxembourg ranks 1st of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Republic of Korea or Luxembourg?
- Republic of Korea, at 3 DB16-20 methodology against 3 DB16-20 methodology in Luxembourg as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Republic of Korea and Luxembourg?
- 0 DB16-20 methodology, with Republic of Korea ahead.
- How many years of comparable data are there for Republic of Korea and Luxembourg?
- 6 years are reported by both, from 2014 to 2019.
- How do Republic of Korea and Luxembourg rank globally for dealing with construction permits: quality control after construction?
- Republic of Korea ranks 1st and Luxembourg ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.