Kosovo (UNSCR 1244) vs Saint Kitts and Nevis: Dealing with construction permits: Quality control after construction
Dealing with construction permits: Quality control after construction over time
- Kosovo (UNSCR 1244)
- Saint Kitts and Nevis
How they compare
Kosovo (UNSCR 1244) currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Saint Kitts and Nevis, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Saint Kitts and Nevis has been ahead every year.
Kosovo (UNSCR 1244) ranks 1st and Saint Kitts and Nevis ranks 1st of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Kosovo (UNSCR 1244) or Saint Kitts and Nevis?
- Kosovo (UNSCR 1244), at 3 DB16-20 methodology against 3 DB16-20 methodology in Saint Kitts and Nevis as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Kosovo (UNSCR 1244) and Saint Kitts and Nevis?
- 0 DB16-20 methodology, with Kosovo (UNSCR 1244) ahead.
- How many years of comparable data are there for Kosovo (UNSCR 1244) and Saint Kitts and Nevis?
- 6 years are reported by both, from 2014 to 2019.
- How do Kosovo (UNSCR 1244) and Saint Kitts and Nevis rank globally for dealing with construction permits: quality control after construction?
- Kosovo (UNSCR 1244) ranks 1st and Saint Kitts and Nevis ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.