Kuwait vs Peru: Dealing with construction permits: Quality control after construction
Kuwait
3 DB16-20 methodology
in 2019
Peru
3 DB16-20 methodology
in 2019
Kuwait rank
1st
Peru rank
1st
Dealing with construction permits: Quality control after construction over time
- Kuwait
- Peru
How they compare
Kuwait currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Peru, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Peru has been ahead every year.
Kuwait ranks 1st and Peru ranks 1st of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Kuwait or Peru?
- Kuwait, at 3 DB16-20 methodology against 3 DB16-20 methodology in Peru as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Kuwait and Peru?
- 0 DB16-20 methodology, with Kuwait ahead.
- How many years of comparable data are there for Kuwait and Peru?
- 6 years are reported by both, from 2014 to 2019.
- How do Kuwait and Peru rank globally for dealing with construction permits: quality control after construction?
- Kuwait ranks 1st and Peru ranks 1st of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.