Lao People's Democratic Republic vs Republic of Moldova: Dealing with construction permits: Quality control after construction
Dealing with construction permits: Quality control after construction over time
- Lao People's Democratic Republic
- Republic of Moldova
How they compare
Lao People's Democratic Republic currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Republic of Moldova, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Republic of Moldova has been ahead every year.
Lao People's Democratic Republic ranks 1st and Republic of Moldova ranks 1st of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Lao People's Democratic Republic or Republic of Moldova?
- Lao People's Democratic Republic, at 3 DB16-20 methodology against 3 DB16-20 methodology in Republic of Moldova as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Lao People's Democratic Republic and Republic of Moldova?
- 0 DB16-20 methodology, with Lao People's Democratic Republic ahead.
- How many years of comparable data are there for Lao People's Democratic Republic and Republic of Moldova?
- 6 years are reported by both, from 2014 to 2019.
- How do Lao People's Democratic Republic and Republic of Moldova rank globally for dealing with construction permits: quality control after construction?
- Lao People's Democratic Republic ranks 1st and Republic of Moldova ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.