Lao People's Democratic Republic vs North Macedonia: Dealing with construction permits: Quality control after construction
Dealing with construction permits: Quality control after construction over time
- Lao People's Democratic Republic
- North Macedonia
How they compare
Lao People's Democratic Republic currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in North Macedonia, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, North Macedonia has been ahead every year.
Lao People's Democratic Republic ranks 1st and North Macedonia ranks 1st of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Lao People's Democratic Republic or North Macedonia?
- Lao People's Democratic Republic, at 3 DB16-20 methodology against 3 DB16-20 methodology in North Macedonia as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Lao People's Democratic Republic and North Macedonia?
- 0 DB16-20 methodology, with Lao People's Democratic Republic ahead.
- How many years of comparable data are there for Lao People's Democratic Republic and North Macedonia?
- 6 years are reported by both, from 2014 to 2019.
- How do Lao People's Democratic Republic and North Macedonia rank globally for dealing with construction permits: quality control after construction?
- Lao People's Democratic Republic ranks 1st and North Macedonia ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.