Lao People's Democratic Republic vs Saint Lucia: Dealing with construction permits: Quality control after construction
Lao People's Democratic Republic
3 DB16-20 methodology
in 2019
Saint Lucia
3 DB16-20 methodology
in 2019
Lao People's Democratic Republic rank
1st
Saint Lucia rank
1st
Dealing with construction permits: Quality control after construction over time
- Lao People's Democratic Republic
- Saint Lucia
How they compare
Lao People's Democratic Republic currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Saint Lucia, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Saint Lucia has been ahead every year.
Lao People's Democratic Republic ranks 1st and Saint Lucia ranks 1st of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Lao People's Democratic Republic or Saint Lucia?
- Lao People's Democratic Republic, at 3 DB16-20 methodology against 3 DB16-20 methodology in Saint Lucia as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Lao People's Democratic Republic and Saint Lucia?
- 0 DB16-20 methodology, with Lao People's Democratic Republic ahead.
- How many years of comparable data are there for Lao People's Democratic Republic and Saint Lucia?
- 6 years are reported by both, from 2014 to 2019.
- How do Lao People's Democratic Republic and Saint Lucia rank globally for dealing with construction permits: quality control after construction?
- Lao People's Democratic Republic ranks 1st and Saint Lucia ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.