Mexico vs Sao Tome and Principe: Dealing with construction permits: Quality control after construction
Dealing with construction permits: Quality control after construction over time
- Mexico
- Sao Tome and Principe
How they compare
Mexico currently reports 2.17 DB16-20 methodology against 2 DB16-20 methodology in Sao Tome and Principe, a difference of 0.17 DB16-20 methodology.
That makes Mexico's figure about 1.1 times Sao Tome and Principe's.
Across all 6 years both countries report, Mexico has been ahead every year.
Mexico ranks 134th and Sao Tome and Principe ranks 135th of 186 countries.
Mexico has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Mexico or Sao Tome and Principe?
- Mexico, at 2.17 DB16-20 methodology against 2 DB16-20 methodology in Sao Tome and Principe as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Mexico and Sao Tome and Principe?
- 0.17 DB16-20 methodology, with Mexico ahead.
- How many years of comparable data are there for Mexico and Sao Tome and Principe?
- 6 years are reported by both, from 2014 to 2019.
- How do Mexico and Sao Tome and Principe rank globally for dealing with construction permits: quality control after construction?
- Mexico ranks 134th and Sao Tome and Principe ranks 135th of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.