Mongolia vs New Zealand: Dealing with construction permits: Quality control after construction

Mongolia
3 DB16-20 methodology
in 2019
New Zealand
3 DB16-20 methodology
in 2019
Mongolia rank
1st
New Zealand rank
1st

Dealing with construction permits: Quality control after construction over time

  • Mongolia
  • New Zealand
0123201420162019

How they compare

Mongolia currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in New Zealand, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, New Zealand has been ahead every year.

Mongolia ranks 1st and New Zealand ranks 1st of 186 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Mongolia or New Zealand?
Mongolia, at 3 DB16-20 methodology against 3 DB16-20 methodology in New Zealand as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Mongolia and New Zealand?
0 DB16-20 methodology, with Mongolia ahead.
How many years of comparable data are there for Mongolia and New Zealand?
6 years are reported by both, from 2014 to 2019.
How do Mongolia and New Zealand rank globally for dealing with construction permits: quality control after construction?
Mongolia ranks 1st and New Zealand ranks 1st of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Mongolia vs New Zealand: Dealing with construction permits: Quality control after construction. Statizoid. Retrieved 25 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/mongolia/new-zealand/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/mongolia/new-zealand/">Mongolia vs New Zealand: Dealing with construction permits: Quality control after construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.