New Zealand vs Saint Lucia: Dealing with construction permits: Quality control after construction
New Zealand
3 DB16-20 methodology
in 2019
Saint Lucia
3 DB16-20 methodology
in 2019
New Zealand rank
1st
Saint Lucia rank
1st
Dealing with construction permits: Quality control after construction over time
- New Zealand
- Saint Lucia
How they compare
New Zealand currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Saint Lucia, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Saint Lucia has been ahead every year.
New Zealand ranks 1st and Saint Lucia ranks 1st of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, New Zealand or Saint Lucia?
- New Zealand, at 3 DB16-20 methodology against 3 DB16-20 methodology in Saint Lucia as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between New Zealand and Saint Lucia?
- 0 DB16-20 methodology, with New Zealand ahead.
- How many years of comparable data are there for New Zealand and Saint Lucia?
- 6 years are reported by both, from 2014 to 2019.
- How do New Zealand and Saint Lucia rank globally for dealing with construction permits: quality control after construction?
- New Zealand ranks 1st and Saint Lucia ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.