Nigeria vs Sudan: Dealing with construction permits: Quality control after construction

Nigeria
2.77 DB16-20 methodology
in 2019
Sudan
2 DB16-20 methodology
in 2019
Nigeria rank
131st
Sudan rank
134th

Dealing with construction permits: Quality control after construction over time

  • Nigeria
  • Sudan
0123201420162019

How they compare

Nigeria currently reports 2.77 DB16-20 methodology against 2 DB16-20 methodology in Sudan, a difference of 0.77 DB16-20 methodology.

That makes Nigeria's figure about 1.4 times Sudan's.

Across all 6 years both countries report, Nigeria has been ahead every year.

Nigeria ranks 131st and Sudan ranks 134th of 185 countries.

Nigeria has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Nigeria or Sudan?
Nigeria, at 2.77 DB16-20 methodology against 2 DB16-20 methodology in Sudan as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Nigeria and Sudan?
0.77 DB16-20 methodology, with Nigeria ahead.
How many years of comparable data are there for Nigeria and Sudan?
6 years are reported by both, from 2014 to 2019.
How do Nigeria and Sudan rank globally for dealing with construction permits: quality control after construction?
Nigeria ranks 131st and Sudan ranks 134th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Nigeria vs Sudan: Dealing with construction permits: Quality control after construction. Statizoid. Retrieved 20 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/nigeria/sudan/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/nigeria/sudan/">Nigeria vs Sudan: Dealing with construction permits: Quality control after construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.