Pakistan vs Palestine, State of: Dealing with construction permits: Quality control after construction

Pakistan
3 DB16-20 methodology
in 2019
Palestine, State of
3 DB16-20 methodology
in 2019
Pakistan rank
1st
Palestine, State of rank
1st

Dealing with construction permits: Quality control after construction over time

  • Pakistan
  • Palestine, State of
0123201420162019

How they compare

Pakistan currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Palestine, State of, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Palestine, State of has been ahead every year.

Pakistan ranks 1st and Palestine, State of ranks 1st of 186 countries.

Palestine, State of has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Pakistan or Palestine, State of?
Pakistan, at 3 DB16-20 methodology against 3 DB16-20 methodology in Palestine, State of as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Pakistan and Palestine, State of?
0 DB16-20 methodology, with Pakistan ahead.
How many years of comparable data are there for Pakistan and Palestine, State of?
6 years are reported by both, from 2014 to 2019.
How do Pakistan and Palestine, State of rank globally for dealing with construction permits: quality control after construction?
Pakistan ranks 1st and Palestine, State of ranks 1st of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Pakistan vs Palestine, State of: Dealing with construction permits: Quality control after construction. Statizoid. Retrieved 05 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/pakistan/west-bank-and-gaza/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/pakistan/west-bank-and-gaza/">Pakistan vs Palestine, State of: Dealing with construction permits: Quality control after construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.