Palau vs Tonga: Dealing with construction permits: Quality control after construction

Palau
3 DB16-20 methodology
in 2019
Tonga
3 DB16-20 methodology
in 2019
Palau rank
1st
Tonga rank
1st

Dealing with construction permits: Quality control after construction over time

  • Palau
  • Tonga
0123201420162019

How they compare

Palau currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Tonga, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Tonga has been ahead every year.

Palau ranks 1st and Tonga ranks 1st of 185 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Palau or Tonga?
Palau, at 3 DB16-20 methodology against 3 DB16-20 methodology in Tonga as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Palau and Tonga?
0 DB16-20 methodology, with Palau ahead.
How many years of comparable data are there for Palau and Tonga?
6 years are reported by both, from 2014 to 2019.
How do Palau and Tonga rank globally for dealing with construction permits: quality control after construction?
Palau ranks 1st and Tonga ranks 1st of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Palau vs Tonga: Dealing with construction permits: Quality control after construction. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/palau/tonga/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/palau/tonga/">Palau vs Tonga: Dealing with construction permits: Quality control after construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.