Papua New Guinea vs Rwanda: Dealing with construction permits: Quality control after construction

Papua New Guinea
3 DB16-20 methodology
in 2019
Rwanda
3 DB16-20 methodology
in 2019
Papua New Guinea rank
1st
Rwanda rank
1st

Dealing with construction permits: Quality control after construction over time

  • Papua New Guinea
  • Rwanda
0123201420162019

How they compare

Papua New Guinea currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Rwanda, a difference of 0 DB16-20 methodology.

The two have swapped places 1 time across 6 shared years of data; in 2014 it was Papua New Guinea ahead.

Papua New Guinea ranks 1st and Rwanda ranks 1st of 186 countries.

Papua New Guinea has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Papua New Guinea or Rwanda?
Papua New Guinea, at 3 DB16-20 methodology against 3 DB16-20 methodology in Rwanda as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Papua New Guinea and Rwanda?
0 DB16-20 methodology, with Papua New Guinea ahead.
How many years of comparable data are there for Papua New Guinea and Rwanda?
6 years are reported by both, from 2014 to 2019.
How do Papua New Guinea and Rwanda rank globally for dealing with construction permits: quality control after construction?
Papua New Guinea ranks 1st and Rwanda ranks 1st of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Papua New Guinea vs Rwanda: Dealing with construction permits: Quality control after construction. Statizoid. Retrieved 25 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/papua-new-guinea/rwanda/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/papua-new-guinea/rwanda/">Papua New Guinea vs Rwanda: Dealing with construction permits: Quality control after construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.