San Marino vs Uganda: Dealing with construction permits: Quality control after construction
San Marino
3 DB16-20 methodology
in 2019
Uganda
3 DB16-20 methodology
in 2019
San Marino rank
1st
Uganda rank
1st
Dealing with construction permits: Quality control after construction over time
- San Marino
- Uganda
How they compare
San Marino currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Uganda, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Uganda has been ahead every year.
San Marino ranks 1st and Uganda ranks 1st of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, San Marino or Uganda?
- San Marino, at 3 DB16-20 methodology against 3 DB16-20 methodology in Uganda as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between San Marino and Uganda?
- 0 DB16-20 methodology, with San Marino ahead.
- How many years of comparable data are there for San Marino and Uganda?
- 6 years are reported by both, from 2014 to 2019.
- How do San Marino and Uganda rank globally for dealing with construction permits: quality control after construction?
- San Marino ranks 1st and Uganda ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.