Sao Tome and Principe vs Senegal: Dealing with construction permits: Quality control after construction
Sao Tome and Principe
2 DB16-20 methodology
in 2019
Senegal
2 DB16-20 methodology
in 2019
Sao Tome and Principe rank
135th
Senegal rank
135th
Dealing with construction permits: Quality control after construction over time
- Sao Tome and Principe
- Senegal
How they compare
Sao Tome and Principe currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Senegal, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Senegal has been ahead every year.
Sao Tome and Principe ranks 135th and Senegal ranks 135th of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Sao Tome and Principe or Senegal?
- Sao Tome and Principe, at 2 DB16-20 methodology against 2 DB16-20 methodology in Senegal as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Sao Tome and Principe and Senegal?
- 0 DB16-20 methodology, with Sao Tome and Principe ahead.
- How many years of comparable data are there for Sao Tome and Principe and Senegal?
- 6 years are reported by both, from 2014 to 2019.
- How do Sao Tome and Principe and Senegal rank globally for dealing with construction permits: quality control after construction?
- Sao Tome and Principe ranks 135th and Senegal ranks 135th of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.