Sao Tome and Principe vs Togo: Dealing with construction permits: Quality control after construction

Sao Tome and Principe
2 DB16-20 methodology
in 2019
Togo
2 DB16-20 methodology
in 2019
Sao Tome and Principe rank
135th
Togo rank
135th

Dealing with construction permits: Quality control after construction over time

  • Sao Tome and Principe
  • Togo
00.511.52201420162019

How they compare

Sao Tome and Principe currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Togo, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Togo has been ahead every year.

Sao Tome and Principe ranks 135th and Togo ranks 135th of 186 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Sao Tome and Principe or Togo?
Sao Tome and Principe, at 2 DB16-20 methodology against 2 DB16-20 methodology in Togo as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Sao Tome and Principe and Togo?
0 DB16-20 methodology, with Sao Tome and Principe ahead.
How many years of comparable data are there for Sao Tome and Principe and Togo?
6 years are reported by both, from 2014 to 2019.
How do Sao Tome and Principe and Togo rank globally for dealing with construction permits: quality control after construction?
Sao Tome and Principe ranks 135th and Togo ranks 135th of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Sao Tome and Principe vs Togo: Dealing with construction permits: Quality control after construction. Statizoid. Retrieved 03 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/sao-tome-and-principe/togo/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/sao-tome-and-principe/togo/">Sao Tome and Principe vs Togo: Dealing with construction permits: Quality control after construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.