Sierra Leone vs Spain: Dealing with construction permits: Quality control after construction
Sierra Leone
3 DB16-20 methodology
in 2019
Spain
3 DB16-20 methodology
in 2019
Sierra Leone rank
1st
Spain rank
1st
Dealing with construction permits: Quality control after construction over time
- Sierra Leone
- Spain
How they compare
Sierra Leone currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Spain, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Spain has been ahead every year.
Sierra Leone ranks 1st and Spain ranks 1st of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Sierra Leone or Spain?
- Sierra Leone, at 3 DB16-20 methodology against 3 DB16-20 methodology in Spain as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Sierra Leone and Spain?
- 0 DB16-20 methodology, with Sierra Leone ahead.
- How many years of comparable data are there for Sierra Leone and Spain?
- 6 years are reported by both, from 2014 to 2019.
- How do Sierra Leone and Spain rank globally for dealing with construction permits: quality control after construction?
- Sierra Leone ranks 1st and Spain ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.