Spain vs Tanzania, United Republic of: Dealing with construction permits: Quality control after construction
Spain
3 DB16-20 methodology
in 2019
Tanzania, United Republic of
3 DB16-20 methodology
in 2019
Spain rank
1st
Tanzania, United Republic of rank
1st
Dealing with construction permits: Quality control after construction over time
- Spain
- Tanzania, United Republic of
How they compare
Spain currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Tanzania, United Republic of, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Tanzania, United Republic of has been ahead every year.
Spain ranks 1st and Tanzania, United Republic of ranks 1st of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Spain or Tanzania, United Republic of?
- Spain, at 3 DB16-20 methodology against 3 DB16-20 methodology in Tanzania, United Republic of as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Spain and Tanzania, United Republic of?
- 0 DB16-20 methodology, with Spain ahead.
- How many years of comparable data are there for Spain and Tanzania, United Republic of?
- 6 years are reported by both, from 2014 to 2019.
- How do Spain and Tanzania, United Republic of rank globally for dealing with construction permits: quality control after construction?
- Spain ranks 1st and Tanzania, United Republic of ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.