Saint Kitts and Nevis vs Tonga: Dealing with construction permits: Quality control after construction

Saint Kitts and Nevis
3 DB16-20 methodology
in 2019
Tonga
3 DB16-20 methodology
in 2019
Saint Kitts and Nevis rank
1st
Tonga rank
1st

Dealing with construction permits: Quality control after construction over time

  • Saint Kitts and Nevis
  • Tonga
0123201420162019

How they compare

Saint Kitts and Nevis currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Tonga, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Tonga has been ahead every year.

Saint Kitts and Nevis ranks 1st and Tonga ranks 1st of 186 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Saint Kitts and Nevis or Tonga?
Saint Kitts and Nevis, at 3 DB16-20 methodology against 3 DB16-20 methodology in Tonga as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Saint Kitts and Nevis and Tonga?
0 DB16-20 methodology, with Saint Kitts and Nevis ahead.
How many years of comparable data are there for Saint Kitts and Nevis and Tonga?
6 years are reported by both, from 2014 to 2019.
How do Saint Kitts and Nevis and Tonga rank globally for dealing with construction permits: quality control after construction?
Saint Kitts and Nevis ranks 1st and Tonga ranks 1st of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Saint Kitts and Nevis vs Tonga: Dealing with construction permits: Quality control after construction. Statizoid. Retrieved 24 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/st-kitts-and-nevis/tonga/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/st-kitts-and-nevis/tonga/">Saint Kitts and Nevis vs Tonga: Dealing with construction permits: Quality control after construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.