Saint Kitts and Nevis vs Zimbabwe: Dealing with construction permits: Quality control after construction
Saint Kitts and Nevis
3 DB16-20 methodology
in 2019
Zimbabwe
3 DB16-20 methodology
in 2019
Saint Kitts and Nevis rank
1st
Zimbabwe rank
1st
Dealing with construction permits: Quality control after construction over time
- Saint Kitts and Nevis
- Zimbabwe
How they compare
Saint Kitts and Nevis currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Zimbabwe, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Zimbabwe has been ahead every year.
Saint Kitts and Nevis ranks 1st and Zimbabwe ranks 1st of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Saint Kitts and Nevis or Zimbabwe?
- Saint Kitts and Nevis, at 3 DB16-20 methodology against 3 DB16-20 methodology in Zimbabwe as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Saint Kitts and Nevis and Zimbabwe?
- 0 DB16-20 methodology, with Saint Kitts and Nevis ahead.
- How many years of comparable data are there for Saint Kitts and Nevis and Zimbabwe?
- 6 years are reported by both, from 2014 to 2019.
- How do Saint Kitts and Nevis and Zimbabwe rank globally for dealing with construction permits: quality control after construction?
- Saint Kitts and Nevis ranks 1st and Zimbabwe ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.