Taiwan vs Tanzania: Dealing with construction: Quality control after
Taiwan
3 DB16-20 methodology
in 2019
Tanzania
3 DB16-20 methodology
in 2019
Taiwan rank
1st
Tanzania rank
1st
Dealing with construction: Quality control after over time
- Taiwan
- Tanzania
How they compare
Taiwan currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Tanzania, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Tanzania has been ahead every year.
Taiwan ranks 1st and Tanzania ranks 1st of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Taiwan or Tanzania?
- Taiwan, at 3 DB16-20 methodology against 3 DB16-20 methodology in Tanzania as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Taiwan and Tanzania?
- 0 DB16-20 methodology, with Taiwan ahead.
- How many years of comparable data are there for Taiwan and Tanzania?
- 6 years are reported by both, from 2014 to 2019.
- How do Taiwan and Tanzania rank globally for dealing with construction permits: quality control after construction?
- Taiwan ranks 1st and Tanzania ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.