United Republic of Tanzania vs Uruguay: Dealing with construction permits: Quality control after construction
United Republic of Tanzania
3 DB16-20 methodology
in 2019
Uruguay
3 DB16-20 methodology
in 2019
United Republic of Tanzania rank
1st
Uruguay rank
1st
Dealing with construction permits: Quality control after construction over time
- United Republic of Tanzania
- Uruguay
How they compare
United Republic of Tanzania currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Uruguay, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Uruguay has been ahead every year.
United Republic of Tanzania ranks 1st and Uruguay ranks 1st of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, United Republic of Tanzania or Uruguay?
- United Republic of Tanzania, at 3 DB16-20 methodology against 3 DB16-20 methodology in Uruguay as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between United Republic of Tanzania and Uruguay?
- 0 DB16-20 methodology, with United Republic of Tanzania ahead.
- How many years of comparable data are there for United Republic of Tanzania and Uruguay?
- 6 years are reported by both, from 2014 to 2019.
- How do United Republic of Tanzania and Uruguay rank globally for dealing with construction permits: quality control after construction?
- United Republic of Tanzania ranks 1st and Uruguay ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.