Tanzania, United Republic of vs Zimbabwe: Dealing with construction permits: Quality control after construction
Tanzania, United Republic of
3 DB16-20 methodology
in 2019
Zimbabwe
3 DB16-20 methodology
in 2019
Tanzania, United Republic of rank
1st
Zimbabwe rank
1st
Dealing with construction permits: Quality control after construction over time
- Tanzania, United Republic of
- Zimbabwe
How they compare
Tanzania, United Republic of currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Zimbabwe, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Zimbabwe has been ahead every year.
Tanzania, United Republic of ranks 1st and Zimbabwe ranks 1st of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Tanzania, United Republic of or Zimbabwe?
- Tanzania, United Republic of, at 3 DB16-20 methodology against 3 DB16-20 methodology in Zimbabwe as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Tanzania, United Republic of and Zimbabwe?
- 0 DB16-20 methodology, with Tanzania, United Republic of ahead.
- How many years of comparable data are there for Tanzania, United Republic of and Zimbabwe?
- 6 years are reported by both, from 2014 to 2019.
- How do Tanzania, United Republic of and Zimbabwe rank globally for dealing with construction permits: quality control after construction?
- Tanzania, United Republic of ranks 1st and Zimbabwe ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.