Tonga vs Uruguay: Dealing with construction permits: Quality control after construction
Tonga
3 DB16-20 methodology
in 2019
Uruguay
3 DB16-20 methodology
in 2019
Tonga rank
1st
Uruguay rank
1st
Dealing with construction permits: Quality control after construction over time
- Tonga
- Uruguay
How they compare
Tonga currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Uruguay, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Uruguay has been ahead every year.
Tonga ranks 1st and Uruguay ranks 1st of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Tonga or Uruguay?
- Tonga, at 3 DB16-20 methodology against 3 DB16-20 methodology in Uruguay as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Tonga and Uruguay?
- 0 DB16-20 methodology, with Tonga ahead.
- How many years of comparable data are there for Tonga and Uruguay?
- 6 years are reported by both, from 2014 to 2019.
- How do Tonga and Uruguay rank globally for dealing with construction permits: quality control after construction?
- Tonga ranks 1st and Uruguay ranks 1st of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.