Trinidad and Tobago vs Vanuatu: Dealing with construction permits: Quality control after construction

Trinidad and Tobago
3 DB16-20 methodology
in 2019
Vanuatu
3 DB16-20 methodology
in 2019
Trinidad and Tobago rank
1st
Vanuatu rank
1st

Dealing with construction permits: Quality control after construction over time

  • Trinidad and Tobago
  • Vanuatu
0123201420162019

How they compare

Trinidad and Tobago currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Vanuatu, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Vanuatu has been ahead every year.

Trinidad and Tobago ranks 1st and Vanuatu ranks 1st of 186 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Trinidad and Tobago or Vanuatu?
Trinidad and Tobago, at 3 DB16-20 methodology against 3 DB16-20 methodology in Vanuatu as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Trinidad and Tobago and Vanuatu?
0 DB16-20 methodology, with Trinidad and Tobago ahead.
How many years of comparable data are there for Trinidad and Tobago and Vanuatu?
6 years are reported by both, from 2014 to 2019.
How do Trinidad and Tobago and Vanuatu rank globally for dealing with construction permits: quality control after construction?
Trinidad and Tobago ranks 1st and Vanuatu ranks 1st of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Trinidad and Tobago vs Vanuatu: Dealing with construction permits: Quality control after construction. Statizoid. Retrieved 29 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/trinidad-and-tobago/vanuatu/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/trinidad-and-tobago/vanuatu/">Trinidad and Tobago vs Vanuatu: Dealing with construction permits: Quality control after construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.