Angola vs Australia: Dealing with construction permits: Quality control before
Angola
1 DB16-20 methodology
in 2019
Australia
1 DB16-20 methodology
in 2019
Angola rank
1st
Australia rank
1st
Dealing with construction permits: Quality control before over time
- Angola
- Australia
How they compare
Angola currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Australia, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Australia has been ahead every year.
Angola ranks 1st and Australia ranks 1st of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control before, Angola or Australia?
- Angola, at 1 DB16-20 methodology against 1 DB16-20 methodology in Australia as of 2019.
- What is the difference in dealing with construction permits: quality control before between Angola and Australia?
- 0 DB16-20 methodology, with Angola ahead.
- How many years of comparable data are there for Angola and Australia?
- 6 years are reported by both, from 2014 to 2019.
- How do Angola and Australia rank globally for dealing with construction permits: quality control before?
- Angola ranks 1st and Australia ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.