Australia vs Guatemala: Dealing with construction permits: Quality control before
Australia
1 DB16-20 methodology
in 2019
Guatemala
1 DB16-20 methodology
in 2019
Australia rank
1st
Guatemala rank
1st
Dealing with construction permits: Quality control before over time
- Australia
- Guatemala
How they compare
Australia currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Guatemala, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Guatemala has been ahead every year.
Australia ranks 1st and Guatemala ranks 1st of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control before, Australia or Guatemala?
- Australia, at 1 DB16-20 methodology against 1 DB16-20 methodology in Guatemala as of 2019.
- What is the difference in dealing with construction permits: quality control before between Australia and Guatemala?
- 0 DB16-20 methodology, with Australia ahead.
- How many years of comparable data are there for Australia and Guatemala?
- 6 years are reported by both, from 2014 to 2019.
- How do Australia and Guatemala rank globally for dealing with construction permits: quality control before?
- Australia ranks 1st and Guatemala ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.