Bahamas vs Congo, Democratic Republic of the: Dealing with construction permits: Quality control before
Dealing with construction permits: Quality control before over time
- Bahamas
- Congo, Democratic Republic of the
How they compare
Bahamas currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Congo, Democratic Republic of the, a difference of 0 DB16-20 methodology.
The two have swapped places 1 time across 6 shared years of data; in 2014 it was Bahamas ahead.
Bahamas ranks 1st and Congo, Democratic Republic of the ranks 1st of 185 countries.
Bahamas has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: quality control before, Bahamas or Congo, Democratic Republic of the?
- Bahamas, at 1 DB16-20 methodology against 1 DB16-20 methodology in Congo, Democratic Republic of the as of 2019.
- What is the difference in dealing with construction permits: quality control before between Bahamas and Congo, Democratic Republic of the?
- 0 DB16-20 methodology, with Bahamas ahead.
- How many years of comparable data are there for Bahamas and Congo, Democratic Republic of the?
- 6 years are reported by both, from 2014 to 2019.
- How do Bahamas and Congo, Democratic Republic of the rank globally for dealing with construction permits: quality control before?
- Bahamas ranks 1st and Congo, Democratic Republic of the ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.