Bosnia and Herzegovina vs Thailand: Dealing with construction permits: Quality control before
Bosnia and Herzegovina
1 DB16-20 methodology
in 2019
Thailand
1 DB16-20 methodology
in 2019
Bosnia and Herzegovina rank
1st
Thailand rank
1st
Dealing with construction permits: Quality control before over time
- Bosnia and Herzegovina
- Thailand
How they compare
Bosnia and Herzegovina currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Thailand, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Thailand has been ahead every year.
Bosnia and Herzegovina ranks 1st and Thailand ranks 1st of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control before, Bosnia and Herzegovina or Thailand?
- Bosnia and Herzegovina, at 1 DB16-20 methodology against 1 DB16-20 methodology in Thailand as of 2019.
- What is the difference in dealing with construction permits: quality control before between Bosnia and Herzegovina and Thailand?
- 0 DB16-20 methodology, with Bosnia and Herzegovina ahead.
- How many years of comparable data are there for Bosnia and Herzegovina and Thailand?
- 6 years are reported by both, from 2014 to 2019.
- How do Bosnia and Herzegovina and Thailand rank globally for dealing with construction permits: quality control before?
- Bosnia and Herzegovina ranks 1st and Thailand ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.