Cape Verde vs Cameroon: Dealing with construction permits: Quality control before construction

Cape Verde
1 DB16-20 methodology
in 2019
Cameroon
1 DB16-20 methodology
in 2019
Cape Verde rank
1st
Cameroon rank
1st

Dealing with construction permits: Quality control before construction over time

  • Cape Verde
  • Cameroon
00.20.40.60.81201420162019

How they compare

Cape Verde currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Cameroon, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Cameroon has been ahead every year.

Cape Verde ranks 1st and Cameroon ranks 1st of 183 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control before construction, Cape Verde or Cameroon?
Cape Verde, at 1 DB16-20 methodology against 1 DB16-20 methodology in Cameroon as of 2019.
What is the difference in dealing with construction permits: quality control before construction between Cape Verde and Cameroon?
0 DB16-20 methodology, with Cape Verde ahead.
How many years of comparable data are there for Cape Verde and Cameroon?
6 years are reported by both, from 2014 to 2019.
How do Cape Verde and Cameroon rank globally for dealing with construction permits: quality control before construction?
Cape Verde ranks 1st and Cameroon ranks 1st of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.