Cape Verde vs Israel: Dealing with construction: Quality control before
Cape Verde
1 DB16-20 methodology
in 2019
Israel
1 DB16-20 methodology
in 2019
Cape Verde rank
1st
Israel rank
1st
Dealing with construction: Quality control before over time
- Cape Verde
- Israel
How they compare
Cape Verde currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Israel, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Israel has been ahead every year.
Cape Verde ranks 1st and Israel ranks 1st of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control before, Cape Verde or Israel?
- Cape Verde, at 1 DB16-20 methodology against 1 DB16-20 methodology in Israel as of 2019.
- What is the difference in dealing with construction permits: quality control before between Cape Verde and Israel?
- 0 DB16-20 methodology, with Cape Verde ahead.
- How many years of comparable data are there for Cape Verde and Israel?
- 6 years are reported by both, from 2014 to 2019.
- How do Cape Verde and Israel rank globally for dealing with construction permits: quality control before?
- Cape Verde ranks 1st and Israel ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.