Cape Verde vs Madagascar: Dealing with construction permits: Quality control before

Cape Verde
1 DB16-20 methodology
in 2019
Madagascar
1 DB16-20 methodology
in 2019
Cape Verde rank
1st
Madagascar rank
1st

Dealing with construction permits: Quality control before over time

  • Cape Verde
  • Madagascar
00.20.40.60.81201420162019

How they compare

Cape Verde currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Madagascar, a difference of 0 DB16-20 methodology.

The two have swapped places 1 time across 6 shared years of data; in 2014 it was Cape Verde ahead.

Cape Verde ranks 1st and Madagascar ranks 1st of 185 countries.

Cape Verde has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: quality control before, Cape Verde or Madagascar?
Cape Verde, at 1 DB16-20 methodology against 1 DB16-20 methodology in Madagascar as of 2019.
What is the difference in dealing with construction permits: quality control before between Cape Verde and Madagascar?
0 DB16-20 methodology, with Cape Verde ahead.
How many years of comparable data are there for Cape Verde and Madagascar?
6 years are reported by both, from 2014 to 2019.
How do Cape Verde and Madagascar rank globally for dealing with construction permits: quality control before?
Cape Verde ranks 1st and Madagascar ranks 1st of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Cape Verde vs Madagascar: Dealing with construction permits: Quality control before. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/cabo-verde/madagascar/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/cabo-verde/madagascar/">Cape Verde vs Madagascar: Dealing with construction permits: Quality control before</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.